This week we continued with filling soil for the grease trap, beam installation for the elevators, water proofing balconies and bathrooms, tile work for the floors and walls and also the balconies, wall plastering, installing steel handrails on the balconies, brick wall installation, casting concrete for the column on the 18th floor, steel column installation on the 18th floor.